Feature · EV charger applications
EV charge points, on the right form, first time.
Add an EV charge point to any job, or run it on its own, and CLRD produces the official ENA EVCP and HP Connections Form, routed connect and notify or apply first by the form's own criteria.
What it is
Full DNO support for EV charge points, including V2G. Pick the charger from the ENA registers, on its own or alongside solar, battery and heat pump devices, and CLRD produces the official ENA EVCP and HP Connections Form with the rest of the pack.
Why it matters
Chargers are load, and load has its own rules. The EVCP and HP form goes in either as a notification after install or an application before install, decided by the site's maximum demand per phase. CLRD works that out from the job data and routes it, so you are never guessing which side of the line a site falls. V2G chargers count as generation and load, and CLRD handles both sides.
For installers adding EV charging to solar work, or fitting chargers on their own.
- Every ENA registered charge point, picked straight from the register.
- V2G handled as generation and load on the same job.
- Connect and notify or apply first, decided by the form's own criteria.
- Mixes with solar, battery and heat pumps on one job, one pack, one credit.
EnlargeWhat you get
The day to day difference.
One credit, whole job
Solar, battery and EV on the same submission, not three.
Routed, not guessed
The notify or apply decision is made from the job data.
Load only jobs welcome
A charger on its own is a first class job, no generation needed.
Before & after
With CLRD vs. without.
See ev charger applications on your own jobs.
A 30-minute demo with a real install, yours or ours.