Managed Jobs · Done for you

G98 and G99 applications, done for you. End to end.

We run the whole DNO job for you: submission, the DNO's replies, amendments, connection offers and the commissioning paperwork. Same day before 2pm. One fixed fee.

Free account first, and most are approved straight away. Nothing to pay until your pack is built.

Pricing

The whole DNO job, for a fraction of the usual fee.

Fixed per job by route, and CLRD works out the route. Each price is the whole job lifecycle: every document below, before and after the install, and every exchange with the DNO in between. It costs less because the CLRD engine builds the pack, so the team's time goes on the DNO, not on paperwork. No subscription, and nothing to pay until the pack is built.

CONNECT AND NOTIFY

Other UK services charge

£50

CLRD

£10/ job

  • G98 notification
  • G99 SGI-1 notification
  • EV charger or heat pump that meets the connect and notify criteria

After the install: commissioning

  • Cover letter
  • G98 Form B1, or G99 Form A3-3
  • ENA EVCP & HP Connections Form
  • Single line diagram
  • Site boundary map
  • Letter of Authority
  • Device schedule
  • G98 or G99 Form D1
  • G100 Forms A and C

APPLICATION

Other UK services charge

£99 to £249

CLRD

£50/ job

  • G99 SGI-2 application
  • G99 SGI-3 application
  • G99 General Type A application, up to 50 kW

Before the install: the application

  • Cover letter
  • G99 Form A1-2, or A1-1 for Type A
  • Manufacturer's Compliance Verification Report
  • G100 Form A
  • Single line diagram
  • Site boundary map
  • Letter of Authority
  • Loop impedance: SSEN's FO-NET-CAB-008 or UKPN's statement
  • Amendment letter

After the install: commissioning

  • Cover letter
  • G99 Form A3-2, or A3-1 for Type A
  • G99 Form A2-4
  • G100 Form C
  • Single line diagram, as installed
  • G98 or G99 Form D1

MIXED GENERATION AND LOAD

One fee

For both sides of the job

CLRD

£75/ job

  • New generation: solar, a battery or a V2G charger
  • With new load: a heat pump or an EV charger
  • Every form the job needs, for one fee
  • Where the job applies to the DNO. Connect and notify throughout is £10.

Before the install: the application

  • Cover letter
  • G99 Form A1-2 or A1-1
  • Manufacturer's Compliance Verification Report
  • ENA EVCP & HP Connections Form
  • G100 Form A
  • Single line diagram
  • Site boundary map
  • Letter of Authority
  • Device schedule
  • Loop impedance: SSEN's FO-NET-CAB-008 or UKPN's statement
  • Amendment letter

After the install: commissioning

  • Cover letter
  • G98 Form B1, or G99 Form A3-3, A3-2 or A3-1
  • G99 Form A2-4
  • G100 Form C
  • Single line diagram, as installed
  • G98 or G99 Form D1

Free account first, and most are approved straight away. Nothing to pay until your pack is built.

The service

We run the whole DNO job, end to end.

Keying a job in is the easy part. The work is everything after it: the DNO's questions, amending the application when they ask for changes, a connection offer or an export limit to deal with, and the commissioning paperwork once it's installed. Hand the job to CLRD and the team who built the platform runs all of it, end to end, in your name.

From the moment it's submitted the DNO's correspondence comes to us, and every job has its own message thread, so you always have a direct line to whoever is running it. The job sits in your account with its full history, the same as one you ran yourself.

The full job lifecycle

From handover to the commissioning notification.

Every stage of the DNO job, and whose move it is. Yours are the handover and the install. The rest is ours.

  1. 01You

    Hand the job over

    A note, the site survey and any files. Whatever you have.

  2. 02CLRD

    Route it and build the pack

    We work out the route and build every document it calls for, checked before it goes.

  3. 03Your customer

    Sign the letter of authority

    On their own phone, from a secure link.

  4. 04CLRD

    Submit it to the DNO

    In your name, the same day if everything's with us before 2pm.

  5. 05CLRD

    Handle the DNO

    Their questions, amendments, loop impedance questions, export limits and the connection offer. If we need something from you, it's on the job's thread.

  6. 06CLRD

    Tell you it's approved

    So you know you're clear to install. Connect and notify routes skip straight to the install.

  7. 07You

    Install and commission

    The one part we can't do for you. Whoever commissioned it signs the commissioning declaration.

  8. 08CLRD

    File the commissioning notification

    The post install pack, submitted inside the DNO's 28 days. The job is complete.

How it works

Two ways to hand over a DNO application.

Managed Jobs is the service. How you hand a job over depends on whether you already use CLRD. Either way it's the same team, the same price and the same end to end job.

New to CLRD

Submit a job

  1. 01

    Open a free account

    No plan and no job credits. Most accounts are approved straight away, and the rest within 24 hours.

  2. 02

    Add your signature and a card

    The forms go out in your name, so we need your signature on file, and a card for the fee. Nothing is charged until the pack is built.

  3. 03

    Start a job and press Escalate to CLRD

    It's on every page of the new job. Add a note, paste in the site survey, and attach your files: PDF, Word, Excel, PowerPoint or photos, up to 10 MB each.

Submit a job

Free account first, and most are approved straight away. Nothing to pay until your pack is built.

Already using CLRD

Press Escalate to CLRD

  1. 01

    On any page of a new job

    Stuck halfway, or would rather not start? The button is on every page of the New Job wizard. What you've entered so far is saved and goes with the job.

  2. 02

    Add a note and your files

    Anything we should know, the site survey, photos and documents.

  3. 03

    Check the price and send

    The price for each route is shown before you send it, with anything your account still needs and the fix beside it.

From there it's the same for both: the job comes to the CLRD team, who run it end to end in your name. It stays in your account, and uses none of a plan's job allowance.

The CLRD team

The team that built CLRD, running your job.

Your job isn't passed to an outsourced desk. It's run by the people who wrote CLRD from the first line of code, learned the DNO process on real installs, and have submitted hundreds of DNO applications since. Nobody knows the system better, because nobody else built it.

Built from the first line of code

We wrote the routing, every form and every page of the pack. When a DNO asks why a job went the way it did, the answer is ours, because we wrote the rule.

Learned in the field

CLRD started on real installs, filing real applications. We know what a site survey leaves out and what the DNO will come back asking for, so we ask first.

One job or a hundred

Every job runs on the same engine with the same checks, so a single notification and a whole housing development get the same care, and a busy month doesn't slow yours down.

Every conversation handled

The DNO's questions, amendments, export limits and connection offers all come to us. You're kept up to date on the job's own message thread, and never left chasing.

CLRD Messages

One thread between you and the team.

Every job you hand over has its own message thread in CLRD, between you and the CLRD team running it. We deal with the DNO. The thread is where you hear about it, and where anything we need from you comes and goes.

  • We talk to the DNO so you don't have to. Their emails come to us and are answered in your name.
  • Upload anything extra straight onto the thread: a photo of the cut out, a revised survey, a test reading. It's on the job from then on.
  • Tied to the job, not lost in an inbox. Every message sits beside the job's documents and history.
  • Unread badges in the app, and new messages in your morning email, so nothing waits on you unseen.

Turnaround

How fast your DNO application is submitted.

BEFORE 2PM

Submitted the same day

Handed over before 2pm, Monday to Saturday, with everything we need from you.

AFTER 2PM, OR SUNDAY

The next working day

Handed over after 2pm, or any time on a Sunday.

ANY DAY

7 days a week

Hand a job over whenever it suits you.

A connect and notify job has nothing to submit before the install: its notification goes once it's commissioned. After submission the wait is the DNO's own assessment, which depends on the route: none for a notification, anything from two to ten weeks for an application.

Free account first, and most are approved straight away. Nothing to pay until your pack is built.

Questions

Getting help with a DNO application.

Who actually does the work?
The CLRD team, the people who built the platform from the first line of code and learned the DNO process on real installs. Nothing is outsourced. We wrote the routing, the forms and the pack, so every job goes out with every part the route calls for, however many you send, and the DNO's questions, amendments, export limits and connection offers all come to us, with you kept up to date on the job's message thread.
Are amendments and connection offers extra?
No. If the DNO asks for changes we amend the application on the same job, and when they send a connection offer we handle it. Our work on both is in the price, and so is the commissioning paperwork after the install. Any charge the DNO makes itself, for a connection offer or its own works, is the DNO's, paid to them. NGED, for example, usually charge £183 for a Type A offer.
Can someone else submit my G99 application for me?
Yes. Hand the job to CLRD and our compliance team completes the G99 application and submits it to the DNO in your name, with your signature. You stay the named installer, the DNO's replies come to the team, and you follow every step on your dashboard.
How much does a G98 notification cost?
£10. That includes the notification, the single line diagram and the commissioning paperwork. A G99 application is £50, and a job installing new generation and load together is £75 where it applies to the DNO, or £10 where it's connect and notify throughout.
Is the single line diagram included?
Yes. Every job's documents include the SLD, along with the letter of authority, the site map, the cover letter and any G100 forms. Nothing is charged on top.
Whose name goes on the forms?
Yours. The forms are completed and signed in your name, and the job sits in your CLRD account with its full history, the same as one you ran yourself.
How quickly is it submitted?
Once we have everything we need from you, an application handed over before 2pm, Monday to Saturday, is submitted the same day. After 2pm, or on a Sunday, it goes the next working day, and you can hand jobs over 7 days a week. From there the wait is the DNO's own assessment, which depends on the route. A connect and notify job has no application: its notification goes after the install.
What do I need to send you?
Whatever you have. A note with the site survey pasted in, and any files: PDF, Word, Excel, PowerPoint, text or photos, up to 10 MB each. If something only you can answer comes up, whoever is running the job asks you on its message thread.
Do I need a subscription?
No. A free CLRD account with your signature on file and a saved card is enough, and managed jobs use none of a plan's job allowance. If you do subscribe, the two work side by side: run the routine jobs yourself and hand over the ones you'd rather not.
I already use CLRD. How do I hand a job over?
Press Escalate to CLRD on any page of a new job. What you've entered so far is saved, you add a note and your files, and the price for each route is shown before you send it.
Can you do EV charger and heat pump DNO applications?
Yes. On its own, the ENA EVCP and HP form is £10 where the equipment meets the connect and notify criteria and £50 where it has to apply first. Installed with new solar or a battery on the same job, it's £75 where the job applies to the DNO, and £10 where it's connect and notify throughout.
Is there anything you can't take on?
A few IDNOs only accept applications through their own portal, so jobs on their networks can't be handed over, and nor, for now, can a commercial job above 50 kW on the Standard Application Form. CLRD tells you before you try.

Start with one job.

Open a free account, add your signature, and hand us the job. We take it from there.

Free account first, and most are approved straight away. Nothing to pay until your pack is built.