INDIVIDUAL INSTALLER

Your evenings shouldn't
belong to DNO paperwork.

Pre install G99 / G100 DNO applications. Post install G98 notifications. Both end up on the kitchen table at 9pm. CLRD does both bits for you: about four minutes for the application, three for the notification.

First job free. No card to start.

INDIVIDUAL INSTALLER

£29/ month

10 jobs / mo · £2.90 per submission

Annual £290 / yr, two months free. Prices exclude VAT.

What's in the box

THE PROBLEM

It's never the install. It's the paperwork around it.

Half the admin happens before you've lifted a panel. G99 and G100 have to be in and approved before the install date, or the job slides. Sub form, SLD, equipment refs, letter of authority, the right DNO portal, all before you can quote a firm date.

The other half lands after. G98 notifications stack up on the kitchen table while you're typing the same details into a different DNO's form for the third time this week. It's the slowest, least billable, most mistake heavy part of your week, and it owns your evenings.

ENA database · inverter lookupLive
CLRD inverter lookup against the ENA type tested databaseCLRD inverter lookup against the ENA type tested databaseEnlarge

WHAT YOU GET OUT OF IT

Get the evening back.
Keep the job tidy.

CLRD takes the inputs you've already got, picks the route, draws the SLD, and generates you a pack you can download or submit in about 4 minutes.

Stop building submissions from scratch

Enter the job once. CLRD routes it G98 or G99, adds G100 where a limitation scheme applies, and produces the pack. No more rebuilding forms job to job.

Never miss a form again

The route is determined by the G98 and G99 thresholds, not by you remembering which DNO needs what on a Friday at 8pm.

Look professional, every time

Consistent SLDs, consistent packs, the LOA done right. The DNO sees a tidy operation, not a solo scramble.

4 min

PER APPLICATION

From 45 to 70 minutes by hand down to about four on CLRD.

10

JOBS / MONTH

Sized for the solo install business.

39

DNOs & IDNOs

Every DNO and nearly every IDNO, applications and notifications.

WHAT'S IN THE BOX

Everything you need to file with the DNO.

01

Four step wizard

Client, site, system, confirm. The same path every job, hard to get wrong.

02

G98 single premises

Post install notification, Form B1 populated from your inputs, ready to send to the local DNO once the system is on.

03

G99 SGI-2, SGI-3 and Gen Type A

The pre install connection application, the right sub form picked from the system data. SGI-1 skips it and gets a post install notification.

04

G100 export limitation

G100 Form A goes with the application: the scheme's ENA references, the export limit and your customer's signature. Form C follows after commissioning, and the CT is drawn on the SLD.

05

Auto generated SLDs

Multi string, batteries, G100 CT, MPAN and DNO cutout. Or upload your own PDF.

06

Every major UK DNO

The MPAN's first two digits name the network owner, and CLRD reads them. You don't pick the DNO; CLRD does.

07

Submission ready pack

Forms, SLD, LOA, supporting docs bundled into one file you can send straight to the DNO.

08

Audit log per job

Every change, every generation and every submission, stamped and stored against the job.

09

Runs in the browser, on any device

Office, van, kitchen table. No install, no licence keys, no IT setup.

AFTER YOU SEND IT

The DNO's side, handled too.

Filing is half the job. The other half is waiting on the DNO, reading what comes back and acting on it. CLRD tracks all of it on the job.

DNO replies

The DNO's answer, read for you

Replies land on the job's own thread. Approval letters from all six DNO groups are read, in the formats CLRD has seen: the reference and any export limit filled in, and one click sends it to your client.

Follow up

A quiet DNO gets flagged

No acknowledgement within 2 working days (10 at operators that don't send one automatically), or no decision after 28 days, and the job tells you. Nobody has to remember to chase.

Amend

Change it without starting again

Need to correct an application the DNO already holds? Amend it on the same job. Only the changed documents go, with a letter saying what changed, on the same DNO thread.

THE PLAN

Run your first job free, then pick your plan.

Sign up and run a real job end to end, with no card. You pick your plan in the app when you're ready for the next one. Or book a demo and we'll take you through it.

INDIVIDUAL INSTALLER

£29/ month

10 jobs / month · single user · £2.90 per submission

For the solo install business doing up to ten jobs a month. Everything you need to stop hand building packs in the evenings.

First job free · No card to start

What's included

  • ✓10 jobs per month
  • ✓G98 and G99 routing (SGI-1, SGI-2, SGI-3, Gen Type A), with G100 where it applies
  • ✓Auto generated SLDs
  • ✓Every major UK DNO and virtually all IDNOs
  • ✓Audit log per job
  • ✓Standard CLRD workflow
  • ✓Standard support
  • ✓Bolt on packs of 10 jobs for £40, never expire
  • ✓Annual billing available (~17% cheaper than monthly)

FAQ

Common questions, answered.

What if I do more than 10 jobs in a month?
Two options. Buy a bolt on pack of 10 jobs for £40, to top up the month without changing plan, or move up to Small Team (£69, 25 jobs/month) any time. Monthly plans have no lock in.
Do I really not have to draw the SLD?
Correct. CLRD generates the SLD from the system inputs you've already entered, including multi string layouts, batteries, G100 CT, MPAN and DNO cutout. If you'd rather supply your own, upload a PDF instead.
How do I know it picked the right DNO and the right form?
The forms are selected deterministically from the system data: G98, the right G99 sub form, G100 where needed, and the DNO is set from the site MPAN. The job shows you what was picked and why before you send anything.
Is it really faster than just doing it myself?
Manually, a DNO application takes most installers 45 to 70 minutes. On CLRD it's roughly four. That's the difference between losing the evening and sitting down for one cup of coffee.
Do I need MCS? An office? An assistant?
If you're MCS certified, you're exactly who it's for, and that's all you need. No office, no assistant. If you can fill in a job sheet, you can run a job through it.
Is there a free trial?
Yes, matched to your scale. Your first job is free, so you can run a real one end to end before paying. Larger trials are arranged with us before you commit. We set one up to fit how you work.
What happens if I cancel?
Your plan runs to the end of the period you've paid for: the month, or the year on annual billing. Your data stays accessible until then, you can export anything you need, and there's no exit fee.

From an installer

“It's not just about the time that it saves, it's more about the stress that it saves for me.”
Andrew · Core Electrics & Renewables

From our job records

9working days

Median from filing to a G99 Type A approval

From our job records

99 of 100

Connection offers first time, across the last 100 applications submitted through CLRD

Bring one of your live jobs.

We'll route it, generate the SLD, build the pack, and show you the output in about four minutes.

First job free. No card to start.