Feature · Heat pump applications
Heat pumps, on the right form, first time.
Add a heat pump to any job, or run it on its own, and CLRD produces the official ENA EVCP and HP Connections Form, routed connect and notify or apply first by the form's own criteria.
What it is
Full DNO support for heat pumps. Pick the unit from the ENA registers, on its own or alongside solar, battery and EV devices, and CLRD produces the official ENA EVCP and HP Connections Form with the rest of the pack.
Why it matters
A heat pump is a large load, and load has its own rules. The EVCP and HP form goes in either as a notification after install or an application before install, decided by the site's maximum demand per phase, counting the heat pump, any other large loads and the everyday household load. CLRD works that out from the job data and routes it, so the decision is made on the numbers rather than a phone call.
For installers fitting heat pumps alongside solar work, or on their own.
- Every ENA registered heat pump, picked straight from the register with its maximum demand.
- Connect and notify or apply first, decided by the form's own criteria.
- Load only jobs supported, no generation required.
- Mixes with solar, battery and EV chargers on one job, one pack, one credit.
EnlargeWhat you get
The day to day difference.
One credit, whole job
Heat pump, solar and battery on the same submission, not three.
Routed, not guessed
The notify or apply decision is made from the site's demand.
Register accurate
Maximum demand comes from the ENA entry, not a datasheet hunt.
Before & after
With CLRD vs. without.
See heat pump applications on your own jobs.
A 30-minute demo with a real install, yours or ours.