CLRD

Roadmap

We move when the regulations move.

Our roadmap follows the regulations. As the ENA framework and DNO requirements change, CLRD changes with them, so you stay compliant before the rules take effect.

Building now
  • DC design verification

    A live MCS string design check in the SLD editor: string voltage, MPPT window, DC fusing, cable ampacity and voltage drop, with a pass/fail card and a client PDF export.

Planned
  • Multi site premises and occupancy

    From 2028, the Future Homes Standard makes solar standard on most new homes in England. CLRD will handle the estate scale, multi plot DNO admin that creates for developers and housebuilders.

  • New EV two way (V2G) form

    Support for the new EV regulation form as soon as it is released.

How we prioritise

Led by the regulations.

We build around the rules installers have to meet. When the ENA framework or DNO requirements change, that shapes what ships next.

01

Regulation first

When the ENA framework or a DNO requirement changes, that goes to the top of the list.

02

Installer-led

Features come from real jobs and real installer feedback, not a wish list.

03

Shipped when it holds up

We build for defensibility at audit, so nothing ships until it stands up to scrutiny.